
Civil Construction
Roadworks, crossovers, verge cuts, industrial access. Built to the plan, handed over tidy.

Officer's estates go up fast, and the drainage has to be in, connected and backfilled before the rest of the build can move.
Officer is largely new greenfield estates, so the work is new-build civil and drainage: stormwater pipe and pits, agi lines, service trenching, crossover excavation and tank holes on fresh blocks.
We work off the drainage plan, dig to the fall, connect to the discharge point and backfill compacted, so the block hands over ready for the next trade.
Greenfield blocks in Officer are a clean slate, which means the levels on the plan are the only thing to work to. Accurate setout and a properly compacted trench are what stop settlement showing up under a driveway a year later.

Roadworks, crossovers, verge cuts, industrial access. Built to the plan, handed over tidy.

Stormwater pipes, trenches, pits, septic. Dig, lay, backfill, compact. Done properly.

Industrial swales, site drainage, runoff management. Stops the water pooling where it shouldn't.






Yes. Officer and Officer South, including the newer estates, are part of our regular South East Melbourne run.
That is core work for us out here - pit and pipe, agi drains and service trenching, set out off your plans and connected to the legal point of discharge.
We do the excavation and civil side of a crossover, cut to the levels your plan and the council require, ready for the concrete crew to follow.
Owner-operated civil and drainage from our Keysborough base. Pick your suburb for local detail, or call Dylan direct on 0431 529 254.
